Monday, April 18, 2016

Spring Presentation 2



On April 13, 2016, the team presented on the progress made in the project. We have flatten some copper wires and bent all of the PVC pipes for the curves. We found that there is a problem with our show collector. We had it designed to stay static, we found that we need our shoe collector to be dynamic as the boggie follows the track along the turns and inclines/declines.

Below is a link to the presentation.
https://docs.google.com/presentation/d/1NItWeO8ehNjhpO3KxgHjH98Eapm9S3xA_7fZyZygblw/pub?start=false&loop=true&delayms=3000